A. always possible
B. practically possible
C. impractical but possible
D. impractical and impossible
Software Engineering MCQS

Software Engineering Mcqs for Test Preparation. These Software Engineering Mcqs are the most repeated mcqs and very important for all type of exams organized by FPSC, PPSC, KPSC, SPSC, BPSC, NTS, PTS, OTS, UTS, CTS, ITS and other testing agencies of Pakistan. Most important FPSC MCQs, PPSC MCQs, KPSC MCQs, SPSC MCQs, BPSC MCQs, NTS MCQs, PTS MCQs, OTS MCQs, UTS MCQs, CTS MCQs, ITS MCQs and other MCQs for test preparation in Pakistan.
A. Data-flow testing
B. Boundary testing
C. Control-flow testing
D. Pair-wise testing
May 21, 2022
A. Integration Testing
B. Acceptance Testing
C. Regression Testing
D. None of the above
May 21, 2022
A. System requirements specification
B. System respond software
C. Software respond system
D. Software requirements specification
May 21, 2022
A. Black-box testing
B. White-box testing
C. Both A and B
D. None of the above
May 21, 2022
A. 1
B. 2
C. 3
D. 4
May 21, 2022
A. Verification ensures the product being developed is according to design specifications.
B. Verifications concentrates on the design and system specifications.
C. Both A and B
D. None of the above
May 21, 2022
A. Validation ensures the product under development is as per the user requirements.
B. Validation do not emphasizes on user requirements.
C. Validation emphasizes on user requirements.
D. Validation is carried out at the end of the SDLC.
May 21, 2022
A. Supporting Structured analysis and design (SA/SD)
B. Maintaining the data dictionary
C. Checking whether DFDs are balanced or not
D. None of the above
May 21, 2022
A. Data Store
B. Data Process
C. Data Flow
D. All of the above
May 21, 2022